Friday, September 08, 2006
Waiting in Line
Tour boats wait for their turn to enter the Daning River. In 2009 the bridge will be almost completely submerged. The tell-tale 175M sign is on the left-hand side of the picture inside the leftward curve of the road, near the white building. The picture is too small on-line for the sign to be legible. You'll just have to take my word for it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment